Warehouse Slabs and External Pavement with Loading Docks and Crossovers.
The Warehouse slab included 38,000m2 of concrete floor and the external pavement was 10,000m2.
We completed just the internal slabs for the Waste Transfer Station in Whyalla.
The new Drakes Supermarkets National Distribution Centre. Approximately 100,000m2 of concrete including internal burnish finish slabs and external pavement. The project was finished in less than 11 months from excavation of footings to finished concrete.
A five-level carpark located near the Elizabeth City Centre shopping complex next to Main North Rd.
A three-level apartment building with stairs and lift shaft. Ground level of over 1,000m2 that included one concrete pour of 500m3.
Our first Autobarn store, floor complete with burnish finish.
Bunnings Edwardstown is approximately 30,000m2 overall and has a suspended concrete floor which includes topping slabs. Our fourth Bunnings store completed in South Australia.
A new food preperation and Cold Storage Warehouse with a Distribution Facility for Bidvest Australia located in Gillman S.A. Total of 10,700m2 of warehouse space including 2100m2 freezer storage, 2500m2 of ambient warehouse, a meat packing and finishing and staging areas. Two story admin office, Dispatch office, 4000m2 of external heavy duty pavement.
New AMPM Service Station at Stirling with black ash concrete external pavement and polished concrete inside the retail shop.